top of page

Detalles de proyecto

DC DESIGN AND CONSTRUCTION

Retail

CATEGORY

Mexico

LOCATION

DESARROLLADORA DEFENSORES

CUSTOMER

2025-2025

YEAR

Alcances

Architectural and engineering design, as well as comprehensive management and supervision of the construction of a distribution center of approximately 15,900 m² in the IPARK Industrial Park, Puebla.

The scope included project management, multidisciplinary technical coordination, cost and document control, and supervision from earthworks and foundations to structure, finishes, and specialized installations. The execution incorporated prefabricated elements and efficient construction systems, in addition to monitoring tools using drone-generated orthophotography to document and visualize construction progress. The project was delivered within 12 months, with the facilities ready to begin operations.

Desafíos de proyecto

Meeting the 12-month deadline required advance planning, constant coordination between contractors and specialists, and rigorous monitoring of the sequence of activities to avoid interference and rework.
Technical management and continuous monitoring allowed for tracking the schedule, anticipating risks, and controlling deviations, ensuring the integration of the various engineering disciplines and compliance with applicable regulations. Furthermore, resource optimization, waste reduction, and proper waste management were among the criteria applied during execution.

bottom of page