Detalles de proyecto
Alcances
Architectural and engineering design for the expansion of an industrial plant for automotive parts storage, with an intervention area exceeding 10,000 m². The project involved replacing an existing building and integrating new architectural, civil, structural, and industrial systems installations.
The scope included project management, construction supervision, multidisciplinary technical coordination, cost and document control, and change management. BIM methodologies and 3D modeling of the building components were implemented, using existing structures as a reference to facilitate compatibility analysis and the integration of the new infrastructure.
Desafíos de proyecto
Work was carried out in the space between existing buildings along the entire perimeter, requiring a carefully planned engineering approach to ensure that the client’s production and operational processes remained uninterrupted and unrestricted. The project adhered to the client’s internal standards—such as maintaining specific clearances between adjacent structures—and involved the temporary modification and closure of a building that served as a connecting link between two other structures, while still allowing operational personnel to access the site during construction.